Shorandam Industrial Park · Kandahar · Afghanistan

Building Afghanistan's
Future, Together

A landmark $150 million industrial initiative delivering world-class cement to power Afghanistan's construction renaissance — engineered for excellence, built to endure.

$150M
Total Investment
1,500
TPD · Phase One Capacity
2026
Phase One Delivery
2
Phases of Growth
Scroll
Kandahar Cement Factory — engineering team on site
2023
The Year Our Journey Began
About Kandahar Cement

A Visionary Industrial
Milestone for Afghanistan

The Kandahar Cement Factory stands as one of the most significant private-sector industrial investments in southern Afghanistan. Strategically located within the Shorandam Industrial Park in Kandahar, this landmark initiative embodies the Ahmad Nabi Zada Group's commitment to national self-sufficiency, infrastructure development, and economic empowerment.

With a total investment of $150 million, the facility is being developed in two meticulously planned phases. Phase One delivers a production capacity of up to 1,500 tonnes per day, scheduled for commissioning by the end of 2026 — expanding to an ultimate capacity of 5,000 tonnes per day in Phase Two, while creating more than 1,000 direct and indirect jobs.

Strategic Location
Shorandam Industrial Park
Sustainable Design
Eco-conscious production
Modern Technology
State-of-the-art machinery
1,000+ Jobs
Empowering communities
Our Foundation

Vision, Mission & Values

— 01 —

Our Vision

To be Afghanistan's foremost cement manufacturer, recognized regionally for uncompromising quality, sustainable practices, and a transformative contribution to national infrastructure reconstruction and economic sovereignty.

— 02 —

Our Mission

To produce world-class cement utilizing cutting-edge technology and rigorous quality standards, while creating over 1,000 skilled jobs, fostering local supply chains, and reducing national dependence on imported construction materials.

— 03 —

Our Values

Integrity in every transaction. Excellence in every tonne. Sustainability in every process. We honor our heritage with disciplined craftsmanship and an unwavering commitment to the communities we serve.

The Project

An Engineering
Masterpiece
in the Making

The Kandahar Cement Factory is more than a manufacturing facility — it is a symbol of resurgence. From foundational excavation to the installation of advanced rotary kilns, every stage of construction reflects international engineering standards and a commitment to enduring quality.

01
Excavation & Site Prep
Completed · 2023–2024
02
Foundation & Civil Works
In Progress · 2024–2025
03
Equipment Installation
Scheduled · 2025–2026
04
Commissioning & Operations
Phase One Live · End of 2026
Construction planning at KCF
Engineering detail at KCF
Cement production at KCF
Factory operations at KCF
By The Numbers

Capacity & Scale

0
Million USD Investment
0
TPD · Phase One Capacity
0
TPD · Full Capacity Target
0
Direct & Indirect Jobs

Production Growth Trajectory

Tonnes per day capacity across both development phases

Production Capacity (TPD)
2026
1,500 TPD
Phase 1
2028+
5,000 TPD
Phase 2 · Full Capacity
The Roadmap

Two Phases of Excellence

A methodical, two-phase development strategy — scaling from an initial 1,500 TPD to a full-scale 5,000 TPD — ensuring operational stability, scalable capacity, and continuous quality enhancement.

— Phase 01 —

Foundation & Initial Production

Construction commenced in 2023 with site preparation and foundational civil works. Phase One will deliver an initial production capacity of up to 1,500 tonnes per day, establishing Kandahar Cement Factory as a key domestic supplier upon commissioning at the end of 2026 — while generating substantial skilled employment for the region.

2023 – 2026 Up to 1,500 TPD $60M Investment
Phase 1 — construction and civil works
— Phase 02 —

Full-Scale Expansion

Building on the operational success of Phase One, the second phase will introduce additional high-capacity production lines, scaling total output to 5,000 tonnes per day — positioning KCF among Afghanistan's largest cement producers, supported by advanced automation, an expanded logistics network, and an export-ready supply framework.

Projected 2027–2029 Up to 5,000 TPD +$90M Investment
Phase 2 — full-scale cement production
Sustainable cement production at KCF
Sustainability
Sustainability

Built for
Generations

Responsible production — modern technology to reduce environmental impact and build a cleaner future for Afghanistan.

Water Management
Water recycling and reuse throughout the production process
Dust Control
Advanced dust-collection systems for clean air
Heat Recovery
Kiln heat reused for maximum energy efficiency
Social Responsibility
Investing in education, health, and local community welfare
The Group Behind KCF
ANZ Logo — Ahmad Nabi Zada Group
Ahmad Nabi Zada
Group (ANZL)

For decades, the Ahmad Nabi Zada Group has invested in the growth of Afghanistan — building businesses that create jobs, strengthen local industry, and open new opportunities for the next generation. Kandahar Cement Factory is the group's flagship industrial initiative: a $150 million commitment to the country's self-reliance.

Rooted in Kandahar
Born and raised in southern Afghanistan
Diversified Investments
Industry, trade, and services
Long-Term Commitment
Building Afghanistan's future
ANZ Logo — Ahmad Nabi Zada Group
Ahmad Nabi Zada Group
The trusted name behind Kandahar Cement Factory
A Group Industrial Initiative
KCF Logo KCF · Kandahar Cement Factory
Contact

Let's Start a Conversation

Whether you're a partner, supplier, investor, or member of the media — our team is ready to hear from you.

Phone
+93 744 777 444
Email
[email protected]
Visit Us
Shorandam Industrial Park, Dand District, Kandahar, Afghanistan
Working Hours
Saturday – Thursday · 8:00 – 17:00
Chat on WhatsApp

Message Received!

Thank you. Our team will contact you within 24 hours.